Erect Architecture

London Borough of Croydon
2011 (Completed)

  • Client:
  • Cypress Primary School
  • Construction Cost: £840,000

Team

  • Architecture, Play design: Erect Architecture
  • Structural engineering: Built Engineers
  • Photography: James Whittaker

Awards

  • Winner, RIBA Award, 2012
  • Finalist, RIBA Client of the Year Award, 2012
  • Finalist, Brick Award, 2011
  • Finalist, 3R Award, 2011

Publications

  • Oliver Wainwright, ‘Structured Play: Building Study South Norwood Children's Centre’, in: Building Design (2011)